Difference between revisions of "Documentation/How Tos/Calc: NETWORKDAYS function"
From Apache OpenOffice Wiki
< Documentation | How Tos
OOoWikiBot (Talk | contribs) m (Robot: Automated text replacement %s) |
m |
||
Line 17: | Line 17: | ||
<tt>'''NETWORKDAYS("2008-09-05"; "2008-09-08"; D1:D2)'''</tt> | <tt>'''NETWORKDAYS("2008-09-05"; "2008-09-08"; D1:D2)'''</tt> | ||
: where D1 contains 8Sep08 and D2 contains 25Dec08, returns <tt>'''1'''</tt>. 5Sep08 is a Friday which is a working day; Saturday and Sunday are ignored; 8Sep08 is a Monday but is specified as a holiday (in cell D1). | : where D1 contains 8Sep08 and D2 contains 25Dec08, returns <tt>'''1'''</tt>. 5Sep08 is a Friday which is a working day; Saturday and Sunday are ignored; 8Sep08 is a Monday but is specified as a holiday (in cell D1). | ||
+ | |||
+ | === Issues: === | ||
+ | * Note that <tt>'''NETWORKDAYS'''</tt> counts the first day of the period (it is inclusive); in contrast <tt>'''DAYS'''</tt> does not. | ||
{{Documentation/SeeAlso| | {{Documentation/SeeAlso| | ||
Line 28: | Line 31: | ||
* [[Documentation/How_Tos/Calc: Functions listed alphabetically|Functions listed alphabetically]] | * [[Documentation/How_Tos/Calc: Functions listed alphabetically|Functions listed alphabetically]] | ||
* [[Documentation/How_Tos/Calc: Functions listed by category|Functions listed by category]]}} | * [[Documentation/How_Tos/Calc: Functions listed by category|Functions listed by category]]}} | ||
− | |||
− | |||
− | |||
− |
Revision as of 16:22, 2 March 2009
NETWORKDAYS
Returns the number of workdays between two dates.
This function is only available if the Analysis AddIn is installed.
Syntax:
NETWORKDAYS(startdate; enddate; hols_range)
- returns the number of workdays between startdate and enddate (inclusive).
- Saturday and Sunday are assumed to be non-working days. hols_range (optional) is a range containing dates of other non-working days.
Example:
NETWORKDAYS("2008-09-05"; "2008-09-08")
- returns 2. 5Sep08 is a Friday and 8Sep08 is a Monday. The Friday and Monday are counted as working days; Saturday and Sunday are ignored.
NETWORKDAYS("2008-09-05"; "2008-09-08"; D1:D2)
- where D1 contains 8Sep08 and D2 contains 25Dec08, returns 1. 5Sep08 is a Friday which is a working day; Saturday and Sunday are ignored; 8Sep08 is a Monday but is specified as a holiday (in cell D1).
Issues:
- Note that NETWORKDAYS counts the first day of the period (it is inclusive); in contrast DAYS does not.